Design Team Chapel Before Design Meeting Masonry Repairs Floor Leveling Reroofing Framing Finish Work

Internal Gutting of the Chapel began on December 27th 2005
The gutting was necessary to examine masonary problems and replace all wiring.

 The Stained Glass Windows
were carefully removed
and stored for refurbishment
by Colorsmith Stained Glass



 All plaster & lath
 was removed by
Dearborn Demolition

 The Balcony was gutted to prepare
for installation of the
Master Bedroom and Bath

 A temporary Driveway
was installed by
Cruz Construction

 Knob & Tube wiring was removed

 The pews await their new home


photo by Bill Ackerman of Suburban Life

 