PRECONSTRUCTION DEMOLITION

An initial Asbestos Abatement is completed by Aces Environmnetal

The Lower Level is prepared for
the demolition of some interior walls

And Kinsale Contacting Group performs the demolition

The unstable Boiler Chimney is removed


But little damage will need to be repaired

The entire upstairs rear room comes out the side door!

And an unexpected beam is found to have been added
to support the Pipe Organ

The Organ Blower Fan is exposed for removal and rewiring.


And the Lower Level is ready for renovation!

 Next - Rough Construction